Blackwater Bridge
Apr 12, 2019
Design ID are working with Fox Contracts to provide a new temporary road diverting traffic away from the existing bridge, so that it can be replaced without disrupting the use of the N2, the primary National Road linking Dublin with the North West.
Design ID are the Contractor’s Lead Designer for the project undertaking the highways design of the temporary road and bridge.