Ballynameen Bridge Repairs
Oct 17, 2018
Refurbishment works at the Ballynameen Bridge Project are nearing completion. The existing bridge structure partially collapsed dramatically during the August 2017 floods. Design ID proposed the Macrete FlexiArch System, clad in the same natural stone recovered from the collapsed structure to replicate the existing aesthetic. We hope overall the finished product will stand for at least another 120 years, and provide the same heritage aesthetics which the locals have enjoyed for their lifetimes.